We read the parcel documents.You decide.

Parcel, plat, and zoning sit in separate files.

Request access now. Confirmation is immediate. An invite follows when a seat opens.

Why SiteM8 exists

The site starts as a parcel map, a plat, and a zoning file.
Reading those by hand takes the hours before design starts.
We read what those records show and cite the source.
You decide.

How SiteM8 works

  1. Upload the parcel documents

    Upload the parcel map, plat, zoning excerpt, and early site PDFs.SiteM8 treats each file as a source.
  2. Cite the file

    What those records show lands in a site memo, with a citation back to the file.SiteM8 does not invent zoning.
  3. You decide

    Go, pass, or send to counsel.SiteM8 does not decide an entitlement or invent a variance outcome.
  4. The next survey stays on the same memo

    Later surveys update the memo.No restart from a blank memo.

Inside the workspace

Every project shows where it stands and what you do next. This sample is not a live job.

Reads the parcel documents · cites the source · you decide

Sample parcel

Parcel · plat · zoning

Open the site memo and confirm each citation. You decide. This sample is not a live parcel.

Memo ready

What SiteM8 does

Closed pilot is for architects and developers screening sites.Pulling the parcel straight from the county map stays later.It is not in this list.
  • Upload parcel, plat, zoning, and early site PDFs once. SiteM8 treats each file as a source.
  • The site memo cites what those files show.
  • Questions stay questions. SiteM8 does not invent zoning.
  • The go or no-go memo stays tied to the source documents.
  • You see what the records show before schematic hours.
  • Export a site memo with the citation trail attached.
  • You review the memo and you decide.

What SiteM8 does not do

  • SiteM8 is not a replacement for a land-use attorney or planner of record.
  • SiteM8 does not decide entitlements or variances.
  • SiteM8 is not a takeoff or bid-estimate product — that is Estym8.
  • SiteM8 is not municipal plan check — that is ColdEyes.
  • SiteM8 is not the check an architect runs before issuing drawings — that is PlanM8.
  • SiteM8 is not an ICT Basis of Design — that is BODi.
  • SiteM8 is the site read, not a chatbot.

How to get access

  1. Request access

    Use your work email.
  2. Get confirmation

    It arrives as soon as you submit.
  3. Wait for an invite

    An invite follows when a seat opens.

SiteM8 is the site read. It is not a chatbot and it does not own the go or no-go call.

One suite.Multiple products.

  • Estym8Closed betaBrief
    Estym8 counts the symbols on the plan set, builds the takeoff, and prices the estimate from cost and labor data.
  • BODiClosed betaBrief
    We tie each claim to its source.You decide.
  • ColdEyesClosed betaBrief
    We present our findings.City staff has the final approval.
  • PlanM8Closed betaBrief
    We check the drawing set.You issue.
  • SiteM8Closed betaBrief
    We read the parcel documents.You decide.

Read the site before schematic

Request access, and an invite follows when a seat opens.